Our proposal was to build a pool with a revegetation buffer. The structure will be constructed in north of the pumping station and towards the end of SCANTOGO's operating area, approximately 150 m from the lake whose geographic coordinates located by GPS on the drainage channel are: 0343549; 0731363. After the examination of the land and the choice of the most convenient place, we began the design phase of the architectural and technical plan of the structure.